Cox Industrial Services was called out to repair a failing booster pump. We removed and brought the rotating assembly to our shop for inspection and repair. We rebuilt the rotating assembly at our shop and installed it in the field. The motor and pump were laser aligned and tested. Unit is operating at full capacity. Turnaround time was two days due to the critical nature of the pump.